New Alucobond cladding replacement throughout to A2 specification (i.e. non combustible). Mix of dark grey to main building mass and light grey to feature communal accommodation.
New Rockwool 100mm insulation to the cladding system designed to achieve a u-value of 0.15.
Replacement glazing to all existing windows to provide a u-value of 1.2.
All ‘half size’ existing windows replaced with full size alternatives.
Floor-to-ceiling windows to breakout area / meeting room of the upper floors
Renewed external doors and new ironmongery, linked to smart access control system.
New bike store & repair station to accommodate 18 cycles. Space for additional bike provision if justified by demand.
Refreshed external amenity space with modern seating and sympathetic landscaping.
New concealed bin storage area.
Gas supply removed from the building and boilers replaced with low carbon alternatives.
New VRF air conditioning & heating system throughout.
Lower volume refrigerant to VRF with consequential reduction in GWP.
New building management system with open protocol for easy integration of additional features.
New air handling plant with 100% fresh air to offices.
New fire alarm system, CCTV, Access control and intruder alarm.
10 x EV charging stations.
Refreshed landscaping on site.
‘Wildlife area’ adjacent to bike store with bird boxes and insect hotel.
Impressive Keith McCarter sculpture adjacent to the entrance.
Double-height reception area with feature lighting, new Therdex XL LVT flooring and generous planting throughout.
Biophilia-led interior design approach to enhance main entrance experience.
Zoned seating areas with feature reception desk, designer furniture, timber slat wall feature and artwork.
Additional integrated seating / shelving area adjacent to lift lobby
Egger cabinetry and concealed LED lighting.
Fully refurbished lifts with high quality natural effect finishes and modern lighting. Both integrated with new access control system.
Fully refurbished WCs with feature lighting, Silestone worktops, Vado accessories and generous planting.
Egger Natural Hamilton Oak finish to vanity unit and Duravit WCs and countertop sinks within bespoke vanity units.
Similarly designed low water usage accessible WCs on each floor.
Local point of use water heating, reducing surplus heating and water usage.
Newly created end of journey facilities to comprise male, female and accessible showers with secure dedicated lockers.
Feature locker storage, shower benches, designer tiling from Moda Ceramics and vanity area to male and female locker rooms.
New LED lighting to all areas. Office lighting typically specified as Whitecroft Cityline Recessed.
New ceiling grid and tiles - Ecophon Gedina A.
Fully carpeted with Burmatex floor tiles.
Raised access flooring with generous floor box ratios and excellent floor to ceiling heights.
Feature atrium to first floor office area.
Full redecoration throughout.
100% renewable energy contract secured with the effect that the building is net zero carbon in operation.
Estimated 2,000 tonnes of carbon saved in the building refurbishment as against a comparable new build.
Substantial recycling during the refurbishment including 89% of carpet tiles and significant cladding materials.